Place of Origin: | CHINA |
Brand Name: | OEM&ODM |
Certification: | ISO9001/ICMQ |
Model Number: | different size |
Minimum Order Quantity: | 1TON |
---|---|
Price: | USD11~USD62/Piece |
Packaging Details: | 4 pcs carton protective corner ,Metal Palletized and shrinked |
Delivery Time: | 15-30 Days Working Days Depends |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability: | 10000 Piece/Piece per Month |
Product Name:: | Aluminum Access Manhole Cover | Material:: | Aluminum-profile |
---|---|---|---|
Process:: | Aluminum Profile,Cutting,Welding,Assembling | Machining Equipment:: | Cutting Machine/WELDING Machine |
Service Provided:: | OEM/ODM/Customized/Design | Applications:: | Industry,Construction And Public Use,etc.,etc. |
High Light: | EN124 Aluminum Manhole Cover,Recessed Aluminum Manhole Cover,EPDM Seals Access Cover |
Access Manhole cover
Description:
Information & Properties
Applications:
How to install an Inspection cover
Remove the cardboard corners and check if there are any damage. Place the cover in the correct position. Apply concrete fillers evenly and adequately on the edge of the frame. Make sure there are no cavitations in concrete, because these cavitations may adversely affect the density of the protective layer or bend under load.
Take into account the final finish layer. Use the level to take the cover to the right height.
Give the concrete plenty of time to harden (at least 48 hours) and open the cover when the concrete is 90% hard. Remove any concrete or other residue on the frame or recessed cover.
Apply the concrete filling to the recessed cover evenly, and place the reinforcement mesh in the right position: make sure it does not touch the bottom or sides.
Take care the height of the finish layer again.
Lay the pavers, tiles or other finish and fill the joints.
Our Service:
We produce various classes of manhole cover and gratings in aluminum from Class A15 to C250 according to customer's sample or requirement.
All kinds and specifications of equipment, strong production capacity, whether it is manual or mechanical welding, regardless of size, demand, we can all meet.
Fast lead time: one week for the mold, one week for the sample, one month for the delivery, time-saving and super valued is our ultimate goal.
Design Team
Quality System
With global valued customers
Contact Person: Daniel.du
Tel: 13186661831